A driveway fails from the bottom up. Soft subgrade, thin spots and missing joints show up as cracks and settled panels a few winters later. We build the part you don't see first: excavation to firm ground, compacted gravel base, and steel set at the right height in the slab.
Then the part you do see: a consistent thickness, control joints laid out so cracks follow the lines instead of wandering, slope that sends water away from the garage, and a broom finish with grip in wet weather.
Harrison lots are often steep and rocky, and a summer storm can send a lot of water down a driveway in a hurry. We set the slope, the base and the drainage so the water goes where it should.
What's Included
- Tear-out and haul-off of the old driveway if needed
- Excavation and compacted gravel base
- Rebar or wire reinforcement
- Control joints laid out for the slab shape
- Slope set to drain away from the house
- Broom or decorative finish
How It Works
- Look at the site. David walks the job with you, measures it, and checks grade, drainage and access.
- Price it in writing. A clear estimate with the size, thickness, reinforcement and finish spelled out.
- Prep and form. Excavation, compacted base, forms and steel set before the truck is ever called.
- Pour, finish and cure. Placed, finished and jointed the same day, then cured properly and the site cleaned up.
Frequently Asked Questions
How thick should a concrete driveway be?
Four inches is the usual minimum for passenger vehicles. We go thicker where trucks, trailers or RVs will park. The estimate states the thickness.
How long does a new driveway take?
Most residential driveways are formed and poured within a few days, weather permitting. Plan on staying off it with vehicles for about a week.
Will a new driveway crack?
All concrete moves as it cures and as the seasons change. A good base, steel and well-placed joints keep that movement in the joints, where it belongs.