A concrete lot costs more up front than asphalt and far less to own. It doesn't soften in summer heat, it handles turning trucks, and it goes many years without resurfacing.
The details decide how long it lasts: a stable base, the right thickness in the drive lanes and at the dumpster pad, joints laid out for the panel sizes, and grades that move water to the drains instead of letting it stand.
Harrison lots are often steep and rocky, and a summer storm can send a lot of water down a driveway in a hurry. We set the slope, the base and the drainage so the water goes where it should.
What's Included
- New lots and lot expansions
- Drive lanes, aprons and approaches
- Heavier sections for truck routes and dumpster pads
- Curbs, gutters and wheel stops
- Grading for drainage
- Phased pours to keep a business open
How It Works
- Look at the site. David walks the job with you, measures it, and checks grade, drainage and access.
- Price it in writing. A clear estimate with the size, thickness, reinforcement and finish spelled out.
- Prep and form. Excavation, compacted base, forms and steel set before the truck is ever called.
- Pour, finish and cure. Placed, finished and jointed the same day, then cured properly and the site cleaned up.
Frequently Asked Questions
Can you pour a lot while we stay open?
Usually. We phase the work so part of the lot and an entrance stay usable.
Concrete or asphalt?
Asphalt is cheaper to install. Concrete lasts longer, handles heavy and turning loads better, and needs less upkeep. For dumpster pads and truck lanes, concrete is the better choice.
How long before cars can park on it?
About a week for passenger vehicles in normal weather. Heavy trucks should wait longer.
Where we work: Parking Lots in Harrison and Boone County.