Equipment pads are small pours with tight requirements. The pad has to be level, sized to the manufacturer's footprint, thick enough for the weight, and placed so service access and clearances work.
Give us the equipment cut sheet or the pad detail from the drawings. We set the pad on compacted base, reinforce it, cast in anchor bolts or sleeves where they are called for, and have it ready before the equipment arrives.
Harrison lots are often steep and rocky, and a summer storm can send a lot of water down a driveway in a hurry. We set the slope, the base and the drainage so the water goes where it should.
What's Included
- HVAC condenser and rooftop unit pads at grade
- Generator and transformer pads
- Tank, compressor and machinery pads
- Anchor bolts, sleeves and conduit stub-ups
- Sized to the manufacturer's footprint
- Housekeeping pads inside mechanical rooms
How It Works
- Look at the site. David walks the job with you, measures it, and checks grade, drainage and access.
- Price it in writing. A clear estimate with the size, thickness, reinforcement and finish spelled out.
- Prep and form. Excavation, compacted base, forms and steel set before the truck is ever called.
- Pour, finish and cure. Placed, finished and jointed the same day, then cured properly and the site cleaned up.
Frequently Asked Questions
How thick does an equipment pad need to be?
It depends on the weight and the manufacturer's requirements. Light condensers sit on four inches; generators and transformers need more. We build to the cut sheet or the drawings.
Can you set anchor bolts for us?
Yes. Give us the bolt pattern and we'll cast them in, or leave the pad clean for drilled anchors.
How soon can equipment be set?
Light equipment in a few days. Heavy equipment should wait for the cure time in the specifications.
Where we work: Equipment & Mechanical Pads in Harrison and Boone County.